Snapshots: Walkway Repair Begins

Construction began over the break to repair the walkways on campus. The crew began in the courtyard by the 700 and 800/900 building.

Students who wish to enter the 800/900 building have to enter from the back door and students from the 700 building have to walk around the back to the side door.

Print Friendly, PDF & Email
3 Comments
  1. josh 41 years ago
  2. cassie 41 years ago
  3. mariahstar 41 years ago
Skip to toolbar